Solutions

EV charger test solutions for every validation workflow.

APEX helps charger manufacturers, certification laboratories, testing institutions and field service teams build repeatable test workflows.

Applications

Testing systems built for field and laboratory workflows

Engineers conducting an EV charger system field test

On-site Charger Commissioning

Portable test systems support charger commissioning, interoperability checks, fault diagnosis and metering verification directly at the charging site.

EV charger interface and waveform testing laboratory

Protocol & Waveform Analysis

Laboratory instrumentation captures charging signals, protocol messages and electrical waveforms for compliance investigation and engineering validation.

Solution Portfolio

Solutions derived from real charger testing workflows

EV Charger Laboratory Testing

An integrated laboratory solution for charging-pile CCC certification, functional verification, protocol analysis and interoperability testing.

Benefits

  • • CCC and standards preparation
  • • GB/T, IEC, CCS and NACS coverage
  • • Automated reports and traceable records

Equipment Used

  • • AST-9000
  • • ST-9980A+ Pro
  • • DC charger interface simulators
  • • Programmable power and load systems

Configure a complete laboratory around the charger type, target market and test plan instead of combining disconnected instruments.

Charger Operations & Maintenance Testing

Mobile and field-ready test platforms for charging-station commissioning, fault diagnosis and periodic maintenance.

Benefits

  • • Vehicle-based mobile testing
  • • On-site fault isolation
  • • Portable records and remote support

Equipment Used

  • • AST-9000C mobile platform
  • • ST-9980A+ Pro
  • • ST-9980 Pro-EA-AC
  • • ST-HCDC series

Service teams can validate installed chargers at the site, reproduce intermittent faults and confirm repair quality before handover.

Production-Line Testing & Aging

Production test and aging systems for AC/DC charger end-of-line validation, automated reporting and factory traceability.

Benefits

  • • End-of-line functional tests
  • • High-volume aging workflows
  • • MES and report integration

Equipment Used

  • • AST-900 / AST-9000
  • • AC and DC test stations
  • • Regenerative loads
  • • Automated control software

Standardize production acceptance across models while keeping test conditions, results and exceptions visible to quality teams.

PV, Storage & Charging Testing

Integrated validation for photovoltaic generation, energy storage, DC charging and grid interaction in one energy system.

Benefits

  • • PV-storage-charger coordination
  • • Grid and load simulation
  • • Scalable project architectures

Equipment Used

  • • AST-9000 test system
  • • Regenerative AC/DC loads
  • • Power quality and waveform instruments

Test the complete energy chain from generation and storage to charging output, with repeatable scenarios for commercial and industrial projects.

Application Architectures

Reference configurations for laboratory, factory and field operations

Use these examples to prepare a project scope. Final equipment, ratings and evidence depend on the actual charger and test plan.

WhatsApp